Location
Fairmount Heights, MD
Project Details
Aaron Enterprises, Inc. was contracted to install 146’ of 54” steel casing by pipe ramming. The casing was installed in two pushes from the same launch pit. The casing was advanced under a stream using a 24” pipe rammer. Spoils were removed using an auger boring machine and 36” steel water main was pushed into place and bulkheaded.
Final Product
54” x 0.750 WT Steel Casing, 36” Steel Water Main Carrier
Geology
Boulders, Weathered Rock
Completion Date
October 2021
Installation Methods
- Pipe Ramming