Location
Claymont, DE
Project Details
Project involved the rehabilitation of an existing concrete archway and sluice box that drained into The Delaware River. Concrete debris created an unstable condition under existing Conrail Tracks. Work crew placed track supports, stabilized the track ballast with cellular grout, removed the mass concrete and installed The DuroMaxx liner pipe, bends and grates under a strict timeline.
Final Product
120 LF Contech DuroMaxx Liner Pipe
Geology
Dredge Fill, Loose Debris, Mass Concrete
Completion Date
October 2021
Installation Methods
- Pipe Rehabilitation
- Pipe Jacking and Tunneling
- Grouting