Location
San Antonio, TX
Project Details
Aaron Enterprises, Inc. was contracted to complete 4 auger bores in San Antonio, TX to relocate a 16” gas main for an upcoming highway project. 450 LF of boring was completed- ranged from 80’ to 175’. Pipe was installed in hard limestone with known karst features using a 16” hammer. Voids were encountered and grouting of the annular area was required to complete bore to highway specifications. Project was completed on a 24/7 basis due to the need for closures of highway on/off ramps.
Final Product
16” Steel Gas Main
Geology
Karst Limestone
Completion Date
February 2022
Installation Methods
- Auger Boring
- Grouting