Location
Stamford, CT
Project Details
Installation of 392 LF of 42” casing to house relocated electric duct banks. Three crossing in hard rock under Long Island Railroad. Stabilized the crown of the bores to minimize potential settlement. Installed conduit duct bank inside 42” sleeves and grouted.
Final Product
Electric Cable System
Geology
Granite rock/boulders overlayed by sand and gravels
Completion Date
December 2016
Installation Methods
- Auger Boring
- Pipe Jacking and Tunneling
- Soil Stabilization
- Grouting