Location
Northern Kentucky
Project Details
Aaron Enterprises, Inc. was contracted to complete a 2,300 LF install of 20” HDPE for gravity sewer in Northern Kentucky. Long distance gravity sewer HDDs are considered to be some of the most challenging and risky HDD’s out there. The crossing was installed completely to specifications with no breaks in allowable grade deviation in solid rock. This HDD is the longest successfully completed gravity sewer install in North America known by AEI.
Final Product
20” HDPE
Geology
Interbedded shale/siltstone/sandstone
Completion Date
August 2020
Installation Methods
- Horizontal Directional Drilling