Location
Ayr Township, Fulton County, PA
Project Details
An existing 4’x4’ concrete box culvert needed relined for a dam reconstruction project in Fulton County PA. A 42” diameter Snap-tite HDPE pipe was installed through the culvert. Spacing needed to be maintained through an existing control tower. A 90PCF non-shrink cellular grout was used as the main annular fill material. Double bulkheads were constructed at each end of the liner pipe and a hydrophilic grout was pumped between the bulkheads for sealing off any potential water seepage that may generate from lake head pressure.
Final Product
250 LF of 42” diameter Snap Tite HDPE Liner Pipe
Completion Date
August 2020
Installation Methods
- Grouting
- Pipe Rehabilitation