Project Details
Aaron Enterprises, Inc. was contracted to install 1,700 LF of 14” HDPE by HDD under the Susquehanna River at a depth of 130’ below the river bottom. The pilot hole was completed utilizing a gyro intersect method with a drill rig on both sides of the river. 36” conductor casing was installed down to the rock on each side of the river through glacial till. A 1,400 LF slip line of the existing water main across the river was also completed on the project by AEI.
Final Product
14” HDPE
Geology
Sandstone/shale/limestone
Completion Date
June 2021
Installation Methods
- Horizontal Directional Drilling
- Pipe Ramming