Location
Harrisonburg, VA
Project Details
Aaron Enterprises, Inc. provided traffic control, test pitting existing utilities, site construction entrances, erosion and sediment control, launch and exit pits, and completion of (2) separate bore and jack road crossings to install 260 linear feet of 42” steel casings under Virginia DOT roads. Backfilling of the pit and site restoration was also performed following the jack and bore. Future 24” water line would be installed at an unknown future date.
Final Product
Water Main
Geology
Dirt with some small boulders encountered
Completion Date
March 2020
Installation Methods
- Auger Boring
- Engineering Services