Location
East Stroudsburg, PA
Project Details
Commercial developers needed a storm water outfall system for a property north of East Stroudsburg, PA. To convey the storm runoff to the Delaware River an auger bore method was used to cross under the highly traveled Route 209. The 30’+ cut to invert placed the crossing in solid rock. A 72” diameter Robbins SBU was used to complete the crossing. Once installed, the crew back grouted behind the casing and coated the interior with a bitumastic epoxy.
Final Product
64 LF of 48” Steel Casing with 2 – 8” Ductile Iron Pipes
Geology
Loose gravel, sand and silt
Completion Date
August 2021
Installation Methods
- Auger Boring
- Grouting